A.t.A.Turns….Progress

Some interesting and telling pictures taken through the week that I would like to share.  The focus this past week has not been on any one thing in particular, but rather everyone staying ahead of everyone else. Contractors are following each other from unit to unit and everything remains on schedule.  The coordination to this point has been flawless.

Windows and sliding glass patio doors were certainly part of the weeks activities.

Tom and Ryan hoist the new patio slider to unit 302

Tom and Ryan hoist the new patio slider to unit 302

 

The slider is dropped in and installed.

The slider is dropped in and installed.

 

 

 

 

 

 

 

 

 

 

The guys are waiting above.

The guys are waiting above.

Unit 504 is a bit more of a challenge.

Unit 504 is a bit more of a challenge.

 

 

 

 

 

 

 

 

All condo's getting new windows and doors (302,309,403 & 504) were complete before the snow came the following day.

All condo’s getting new windows and doors (302,309,403 & 504) were complete before the snow came the following day.

 

It's dropped on the balcony.

It’s dropped on the balcony.

 

 

 

 

 

 

 

 

 

 

Update on Unit 414……….

Porcelain tile is then meticulously installed.

Porcelain tile is then meticulously installed.

Anti-fracture membrane is laid before the ceramic tile floors

Anti-fracture membrane is glued to the cement floors before finish product.

Unit 109……

New framed walls are nearly complete

New framing for walls is nearly complete.

  

A completely new floor plan

A completely new floor plan from the original studio.

 

          


 

 

 

 

Unit 406….

New tile in the bathroom is nearly complete.

New tile in the bathroom only needs grout…

 

 

....and the fireplace rock is nearly completed

….and the fireplace rock is nearly completed

 

 

 

 

 

 

 

 

 

 

Unit 309…..

New fireplace before...

New fireplace is framed in (notice the installed patio door).

....and the finish rock is in place (notice the new patio door).

….and the finish rock is in place.

 

 

 

 

 

 

 

 

Exterior Repairs….

New doors and windows results in stucco repairs

New doors and windows results in stucco repairs

Day two of repairs.

Day two of repairs.

 

 

 

 

 

 

 

 

The progress is becoming more evident every day.  Stay tuned for another update next week.